Technical Provisions and Standard Drawings
Mike Tobin, Deputy Director/Public Works Department701 N. 7th StreetSuite 715913-573-5500Fax: 913-573-5766Email: mtobin@wycokck.org
Office Hours:Monday – Friday 8:00 am to 5:00 pm
The Revision date for roads and sewers is April 2008
Standard Manhole Detail, Sheet 2 of 3 was revised on 7/31/12.
(Acrobat document opens in a new window.) If you don't have Acrobat Reader, you can download it for free by clicking here.
TABLE OF CONTENTS
SECTION 1000 – GENERAL REQUIREMENTS........................................ 1000 – 01
SECTION 1100 – REMOVALS............................................................. 1100 – 01SECTION 1200 – INCIDENTAL CONSTRUCTION.................................... 1200 – 01
SECTION 1300 – TRAFFIC CONTROL.................................................. 1300 – 01SECTION 1400 – CONSTRUCTION PERIOD POLLUTION PREVENTION..... 1400 – 01
SECTION 1500 – INSPECTION OF LAND DEVELOPMENT....................... 1500 – 01
SECTION 2000 – EARTHWORK.......................................................... 2000 – 01SECTION 2100 – TRENCHING AND TUNNELING.................................... 2100 – 01SECTION 2200 – SUBGRADE PREPARATION AND PAVEMENT MILLING...2200 – 01
SECTION 2250 – UTILITY PATCH REQUIREMENTS................................ 2250 – 01
SECTION 2300 – BLASTING............................................................... 2300 – 01
SECTION 2400 – RIPRAP AND GABIONS............................................ 2400 – 01
SECTION 3000 – PLANT MIX ASPHALT................................................ 3000 – 01
SECTION 3100 – ASPHALT PAVING.................................................... 3100 – 01
SECTION 3200 – PAVEMENT TRUENESS................................................ 3200 – 01
SECTION 3300 – ASPHALT REPAIRS................................................... 3300 – 01
SECTION 4000 – CONCRETE MATERIALS AND METHODS ........................ 4000 – 01
SECTION 4100 – CONCRETE PAVEMENT AND FLATWORK........................ 4100 – 01
SECTION 4200 – CONCRETE STRUCTURES.............................................. 4200 – 01
SECTION 5000 – MANHOLE CONSTRUCTION........................................... 5000 – 01
SECTION 5100 – SANITARY SEWER MAIN............................................. 5100 – 01
SECTION 5200 – STORM SEWER........................................................... 5200 – 01
SECTION 5300 – CURED-IN-PLACE PIPE............................................... 5300 – 01
SECTION 5400 – LINING EXISTING MANHOLE........................................ 5400 – 01
SECTION 5500 – STORM SEWER INLETS................................................. 5500 – 01
SECTION 6100 – PAVEMENT MARKING (THERMOPLASTIC)....................... 6100 – 01
SECTION 6150 – PAVEMENT MARKING (PAINT)...................................... 6150 – 01
SECTION 6200 – UNIT PAVERS............................................................. 6200 – 01
SECTION 6300 – CHAIN LINK FENCE...................................................... 6300 – 01
SECTION 6400 – STONE RETAINING WALL.............................................. 6400 – 01
SECTION 6500 – MODULAR BLOCK RETAINING WALL SYSTEM................... 6500 – 01
SECTION 7000 – SEEDING, SODDING, AND MULCHING............................. 7000 – 01
SECTION 7100 – TREES AND SHRUBS...................................................... 7100 – 01
INDEX................................................................................................. Index I
STANDARD DETAILS..........................................................................................
LOG OF REVISIONS.............................................................................. LOC – 01