Developers/Development Requirements

Developers Requirements

Construction Sites

Construction Site Chapter 8 Ordinance: Construction Site Operators are required to have erosion and sediment controls to ensure compliance with Section 8 of the Unified Government's ordinance for construction activity disturbing greater to or equal to one acre. These Operators are also required to control things such as silt, discarded building materials, concrete truck washout, chemicals, litter and sanitary waste at the construction site that may cause adverse impacts to stormwater runoff.

Post Construction

Post Construction Ordinance: Post Construction stormwater management in new development and redevelopment focuses on implementation of controls to maintain good quality conditions after an area has been developed.

Development Standards

Land Disturbance Permit

Erosion and Sediment Control (ESC) Requirements(PDF, 2MB)

Post-construction BMP’s (Stormwater Treatment Facilities)